1 |
Corrigendum of the notification no. 4194 dated 22.02.2024 |
|
Download(59.01 KB)
|
2 |
Transfer and Posting of BDOs |
|
Download(1.6 MB)
|
3 |
Pre-bid Queries of the RFP for Selection of Agency/Firm for establishment and operations of Grievance Management System through Call Centre |
|
Download(349.47 KB)
|
4 |
Issue of Entry Pass for newly recruited GPDO Orientation Programme |
|
Download(249.74 KB)
|
5 |
RFP for Establishment and Operation of Grievance Management System (BASUDHA Helpline) through Call Centre |
|
Download(807.88 KB)
|
6 |
List of candidates selected for the post of Gram Panchayat Development Officer under PRDW Department by OSSC |
|
Download(437.4 KB)
|
7 |
Relaxation of residency period in the post of GPDO for promotion to ABDO |
|
Download(31.73 KB)
|
8 |
Promotion of DPOs to the rank of Deputy Directors under OPRS Rules |
|
Download(341.23 KB)
|
9 |
Cancellation of Office Order on State Sector Scheme: State Support to MGNREGA |
|
Download(43.58 KB)
|
10 |
Counselling and document verification of selected candidates for appointment of JE under PR&DW Department |
|
Download(1.34 MB)
|
11 |
Schedule for document verification of selected candidates for appointment as Junior Engineer |
|
Download(1.34 MB)
|
12 |
Second Clarification and amendments to the RFP No: 118 dated 05-09-2023 of MGNREGS ODISHA SOCIETY, Panchayati Raj and Drinking Water Department |
|
Download(524.13 KB)
|
13 |
Transfer and posting of Junior Engineers of Panchayati Raj and Drinking Water Department |
|
Download(1016.23 KB)
|
14 |
Clarification and amendments to the RFP No-118 Dated 05-09-2023 of MGNREGS Odisha Society, Panchayati Raj & Drinking Water Department |
|
Download(91.63 KB)
|
15 |
Promotion of two Deputy Director(Geology) to Joint Director(Geology) in Level-14 at Pay Matrix of ORSP Rule-2017 on ad-hoc basis for one year |
07/09/2023 |
Download(77.74 KB)
|
16 |
Appointment of Six IAS Probationer of 2022 Batch of Odisha Cadre as BDO in Block as part of training for 8 weeks |
|
Download(90.48 KB)
|
17 |
Nomination for "Pradhan mantri Rastriya Bal Puraskar for children(2024)" |
|
Download(781.63 KB)
|
18 |
Guideline for setting up of Biogas plant under GOBARdhan scheme under SBM-G |
|
Download(431.75 KB)
|
19 |
RFP for Conducting EIA Study of State Sector Scheme - State Support to MGNREGS |
|
Download(2.47 MB)
|
20 |
Sri Uttam Kumar Sahoo, Assistant Engineer of Bhadrak is hereby promoted to Assistant Executive Engineer and posted to Khaira Block, and Sri Saumyamukul Barik Assistant Executive Engineer Khaira Block is moved to Baliapal Block |
|
Download(45.47 KB)
|